11/19/2022 0 Comments Master scheduler![]() #MASTER SCHEDULER UPDATE#This role will be challenged to coordinate real time inputs from production data sources, to update and communicate the supply plan. Working closely with 3rd Party contract manufactures in Western continents and Pacific Rims on lead times and capacity management. Assess production schedule impacts, with root cause and corrective action recommendations. This position will require an experienced Master Scheduler to manage and manage supply plan concert with demand planning scheduling. Director of Sales, Inventory and Operations Planning (SIOP). The role of Master Schedule is a critical key functional position, reporting directly to the Sr. Every day we work to ensure that we maintain these competitive advantages and our position as a global leader in providing turnkey, battery energy storage solutions for utility-scale, commercial and industrial, and microgrid applications. Powin has distinct competitive advantages: cost-effectiveness reliability scalability deploy-ability and operational sophistication. Powin is, and will continue to be, one of a handful of companies that will provide the equipment necessary to make this happen. That means we build power plants out of batteries that put coal and gas generators out of business and enable sustainable viability for renewable energy sources like solar and wind. Powin Energy is a leading producer of utility scale modular battery energy storage system (complete with a patented, advanced, cloud-based monitoring/control system). We’re Building the Future! Ever want to do hard work that will make a REAL difference in the world? Do you want to solve some of the most difficult problems with a team of exceptional players at a company that does not believe in impossible? ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |